Abstract
The Sanitary-Epidemiological Station of County Gyor-Sopron has accomplished some analysis of road traffic noise. On the basis of these investigations an answer should be given to the question of how far prediction methods for road traffic noise are reliable and to what extent they can be used for planning. The investigations will take 2 years (1984-1985). Research work was sponsored by the National Authority for Environment Protection and Nature Conservation. This report outlines the investigations performed in 1984, and the data published therein may be modified as required according to the 1985 investigations.References
[1] L. CZABALY, […] Hangtechnika, 24, 165-168 (1978).
[2] L. CZABALY, F. HIRKA, […], 6th Days of Environmental Protection in Engineering, Gyodr (1984).
[3] DIN 18 005 Teil 1. […], Entwurf 1976.
[4] MI-07.3704-81. […], 1981.
[5] The computing model for Road Traffic Noise Statens Planverk. Nordic Council of Ministers’ project, Report No. 48 (1980).
[2] L. CZABALY, F. HIRKA, […], 6th Days of Environmental Protection in Engineering, Gyodr (1984).
[3] DIN 18 005 Teil 1. […], Entwurf 1976.
[4] MI-07.3704-81. […], 1981.
[5] The computing model for Road Traffic Noise Statens Planverk. Nordic Council of Ministers’ project, Report No. 48 (1980).